myLaws for the mineral industry

The following is a listing of the regulatory permits and other notable requirements for common activities related to mineral projects. Selecting an activity will bring you to a page that lists the relevant legislation and include links to the relevant statute, regulations and application guides and forms. Please note that some activities may be governed by more than one regulatory requirement.

Visit the Regulation Registry to view regulatory proposals as well as recently approved regulations.

Find your activity in alphabetical order.

Listing: M-P


M

Migratory Birds, Activities Impacting

Requirement/ Permit:

Applies To:

  •  Any activities that may impacting on migratory birds 

Mills / Processing Plants (See Mine Development / Production)

Mine Development

Requirement/ Permit:

Applies To:

  • All new mining projects

Mine Development / Production

Requirement/ Permit:

Applies To:

  • Commencement or re-commencement of Mine Production

Mine Production

Requirement/ Permit:

Applies To:

  • Mineral lease or patent is required for commercial extraction of minerals. 

Mineral Collecting

Requirement/ Permit:

 Applies To:

  • Applies to collection of small scale hobby collection of mineral specimens on crown held mineral rights

Mineral Collection - Export of Cultural Property

Requirement/ Permit:

Applies To:

  • Export Mineral specimens, meeting criteria of Canadian Cultural Property Export Control List

Mineral Processing out of Canada

Requirement/ Permit:

Applies To:

  • Exemption required for mineral processing outside of Canada

Mineral Rights

Requirement/ Permit:

Applies To:

  • Acquisition of mining / mineral right under the Mining Act

Mineral Rights Under Roads

Requirement/ Permit:

Applies To:

  • Regulations on acquisition of mineral rights under road easements.   

Mining

Requirement/ Permit:

Applies To:

  • within municipalities where existing zoning requires change

Mining – Training Requirements

Requirement/ Permit:

Applies To:

  • Worker training for underground and surface mining 

Mining – Remote Mines

Requirement/ Permit:

Applies To:

  • In order to qualify for remote Mining Tax rates

Mining Claims – Assessment Work

Requirement/ Permit:

Applies To:

  • Applies to all unpatented mining claims in order continue to hold ground

Mobile Home

Requirement/ Permit:

Applies To:

  • Ministers Zoning Order required to erect more than one mobile home on a parcel of land unless authorized by a by-law or under section 13 to the Public Lands Act

N

Noise – Discharge or Emissions

Requirement/ Permit:

Applies To:

  • Discharge of a contaminant into the natural environment, including noise

Injury to Worker/Employee

Requirement/ Permit:

Applies To:

  • Notice is required for the occurrence of an injury

P

PCB Waste Movement

Requirement/ Permit:

Applies To:

  • moving PCB wastes for disposal or decontamination  

PCB Waste Storage

Requirement/ Permit:

Applies To:

  • storage and movement PCB waste materials 

Plans – Mine Plans

Requirement/ Permit:

Applies To:

  • Projects subject to a Closure Plan under the Mining Act must annually prepare and updated site plan and plans and sections of mine workings

Pipeline Construction

Requirement/ Permit:

Applies To:

  • Construction of Hydrocarbon pipelines of
    (a) more than 20km in length;
    (b)projected cost more than the amount prescribed by regulation;
    (c)  any part of the line
    (i) uses pipe 12 inches or more, and ii) has an operating pressure of 2,000 kpa or more; or
    (d)  meets criteria as prescribed

Potable Water (See Drinking Water)

Power Generators

Requirement/ Permit:

Applies To:

  • Generated power greater than 5MW by fuel oils. 

Power Generators

Requirement/ Permit:

Applies To:

  • Generated power greater than 1MW less than 5MW for fuel oil

Power Transmission Line

Requirement/ Permit:

Applies To:

  • transmission line projects involving more than 2 km of line and which:
    (1) Are capable of operating at a nominal voltage level of 115 kV.
    (2) Are capable of operating at a nominal voltage level
    higher than 115 kV and less than 500 kV and which
    involve less than 50 km of line

Power Transmission Line Construction

Requirement/ Permit:

Applies To:

  • construction, expansion or reinforcement of line or interconnection

Pressure Vessels

Requirement/ Permit:

Applies To:

  • Requirements for pressure vessels by TSSC.  

Property (see Land)