Order - Granting Leave to Construct a Power Transmission Line

  • Authorization to construct power transmission lines

Ministry: Ontario Energy Board (OEB)

Act: Ontario Energy Board Act Section 92 (1)

Regulation:

Other Website Links (if any):

Contact Branch/Section:

Key Words:

  • Ontario Energy Board
  • power transmission lines
  • hydro line
  • powerline
  • power line
Page 2038581 |