You're using an outdated browser. This website will not display correctly and some features will not work.
Learn more about the browsers we support for a faster and safer online experience.

# result(s)

Important: This version of the e-Laws website will be upgraded to a new version in the coming weeks.
You can try the beta version of the new e-Laws at ontario.ca/laws-beta.

R.R.O. 1990, Reg. 147: FILL, CONSTRUCTION AND ALTERATION TO WATERWAYS - ESSEX REGION

under Conservation Authorities Act, R.S.O. 1990, c. C.27

Skip to content
Versions
revoked or spent May 4, 2006
September 23, 1991 May 3, 2006

Conservation Authorities Act
Loi sur les offices de protection de la nature

R.R.O. 1990, REGULATION 147

Amended to O. Reg. 158/06

FILL, CONSTRUCTION AND ALTERATION TO WATERWAYS — ESSEX REGION

Note: This Regulation was revoked on May 4, 2006. See: O. Reg. 158/06, s. 13.

This Regulation is made in English only.

1. In this Regulation,

Authority” means the Essex Region Conservation Authority;

“building or structure” means a building or structure of any kind;

“drainage area” means, for a point, the area which contributes runoff to that point;

“fill” means earth, sand, gravel, building materials, storage materials, rubble, rubbish, garbage or any other material whether similar to or different from any of the aforementioned materials, whether originating on the site or elsewhere, used or capable of being used to raise, lower or in any way affect the contours of the ground;

“fill line” means any line designated as such on the maps referred to in the Schedules;

“mm” means millimetres;

“regional storm” means a storm producing in a forty-eight hour period in a drainage area of,

(a) twenty-five square kilometres or less, a rainfall that has the distribution set out in Table 1, or

(b) more than twenty-five square kilometres, a rainfall such that the number of millimetres of rain referred to in each case in Table 1 shall be modified by the percentage amount shown in Column 2 of Table 2 opposite the size of the drainage area set out opposite thereto in Column 1 of Table 2:

TABLE 1

73 mm of rain in the first 36 hours

6 mm of rain in the 37th hour

4 mm of rain in the 38th hour

6 mm of rain in the 39th hour

13 mm of rain in the 40th hour

17 mm of rain in the 41st hour

13 mm of rain in the 42nd hour

23 mm of rain in the 43rd hour

13 mm of rain in the 44th hour

13 mm of rain in the 45th hour

53 mm of rain in the 46th hour

38 mm of rain in the 47th hour

13 mm of rain in the 48th hour

TABLE 2

Column 1

Column 2

Drainage Area (in square kilometres)

Percentage

26 to 45 both inclusive

99.2

46 to 65 both inclusive

98.2

66 to 90 both inclusive

97.1

91 to 115 both inclusive

96.3

116 to 140 both inclusive

95.4

141 to 165 both inclusive

94.8

166 to 195 both inclusive

94.2

196 to 220 both inclusive

93.5

221 to 245 both inclusive

92.7

246 to 270 both inclusive

92.0

271 to 450 both inclusive

89.4

451 to 575 both inclusive

86.7

576 to 700 both inclusive

84.0

701 to 850 both inclusive

82.4

851 to 1000 both inclusive

80.8

1001 to 1200 both inclusive

79.3

1201 to 1500 both inclusive

76.6

1501 to 1700 both inclusive

74.4

1701 to 2000 both inclusive

73.3

2001 to 2200 both inclusive

71.7

2201 to 2500 both inclusive

70.2

2501 to 2700 both inclusive

69.0

2701 to 4500 both inclusive

64.4

4501 to 6000 both inclusive

61.4

6001 to 7000 both inclusive

58.9

7001 to 8000 both inclusive

57.4

“river”, “lake”, “creek”, “stream” or “watercourse” means any river, lake, creek, stream or watercourse under the jurisdiction of the Authority. R.R.O. 1990, Reg. 147, s. 1.

2. The areas described in the Schedules are areas in which, in the opinion of the Authority, the control of flooding or pollution or the conservation of land may be affected by the placing or dumping of fill. R.R.O. 1990, Reg. 147, s. 2.

3. Subject to section 4, no person shall,

(a) construct any building or structure or permit any building or structure to be constructed in or on a pond or swamp or in any area susceptible to flooding during a regional storm;

(b) place or dump fill, or permit fill to be placed or dumped, permanently or temporarily, in the areas described in Schedule 1, whether such fill is already located in or upon such area or brought to or on such area from some other place or places; or

(c) straighten, change, divert or interfere in any way with the existing channel of a river, lake, creek, stream or watercourse. R.R.O. 1990, Reg. 147, s. 3.

4. Subject to the Ontario Water Resources Act or to any private interest, the Authority may permit in writing the construction of any building or structure, or the placing or dumping of fill, or the straightening, changing, diverting or interfering with the existing channel of a river, lake, creek, stream or watercourse, to which section 3 applies if, in the opinion of the Authority, the site of the building or structure or the placing or dumping of fill and the method of construction or placing or dumping of fill or the straightening, changing, diverting or interfering with the existing channel will not affect the control of flooding or pollution or the conservation of land. R.R.O. 1990, Reg. 147, s. 4.

5. No person shall commence to construct any building or structure, or dump or place fill, or straighten, change, divert or interfere with the existing channel of a river, lake, creek, stream or watercourse, in any area to which section 3 applies before permission to do so has been obtained under section 4. R.R.O. 1990, Reg. 147, s. 5.

6. (1) A signed application for permission to construct a building or structure shall be filed with the Authority and shall include,

(a) four copies of a plan of the property showing the proposed location of the building or structure, its elevation and the proposed final grade plan;

(b) four copies of a complete description of the type of building or structure to be constructed, including drainage details and the method of construction;

(c) four copies of a statement of the dates between which the construction will be carried out; and

(d) four copies of a statement of the proposed use of the building or structure following completion of the construction. R.R.O. 1990, Reg. 147, s. 6 (1).

(2) A signed application for permission to place or dump fill shall be filed with the Authority and shall include,

(a) four copies of a plan of the property on which the fill is to be placed, showing the proposed location of filling, the depth to which it is proposed to fill and the proposed final grade of the land when filling is completed;

(b) four copies of a complete description of the type of fill proposed to be placed or dumped and the method of placing or dumping the fill;

(c) four copies of a statement of the dates between which the placing or dumping will be carried out; and

(d) four copies of a statement of the proposed use of the land following completion of placing or dumping. R.R.O. 1990, Reg. 147, s. 6 (2).

(3) A signed application for permission to straighten, change, divert or interfere in any way with the existing channel of a river, lake, creek, stream or watercourse shall be filed with the Authority and shall include,

(a) four copies of a plan on which shall be shown in plan view and cross section the details of the straightening, change, diversion or interference;

(b) four copies of a description of the protective measures to be undertaken and the method to be used to carry out the straightening, change, diversion or interference;

(c) four copies of a statement of the dates between which the straightening, changing, diverting or interfering will be carried out; and

(d) four copies of a statement of the purpose of the proposed work. R.R.O. 1990, Reg. 147, s. 6 (3).

7. The Authority may, at any time, withdraw any permission given under section 4 if, in the opinion of the Authority, the representations contained in the application for permission are not carried out. R.R.O. 1990, Reg. 147, s. 7.

8. Members of the staff of the Authority are appointed as officers to enforce this Regulation. R.R.O. 1990, Reg. 147, s. 8.

SCHEDULE 1
LITTLE RIVER

That part of the watershed of Little River in the City of Windsor and the townships of Sandwich East and Sandwich South, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER1-1 to ER1-6, inclusive, and identified by a stamp of the Registrar of Regulations dated the 23rd day of January, 1991.

Concession

Lot

I.

(Plan of the Township of Sandwich East)

Parts of 133, including part of lots 1 to 71, both inclusive, and part of Block B, Reg. Plan No. 1533, and including parts of lots 1 to 8, both inclusive, Plan M-113

   

Parts of 129 West, 132 and 134, including part of Lot 1 and part of lots 3 to 20, both inclusive, Plan No. 1501

II.

(Plan of the Township of Sandwich East)

Parts of 128, including parts of Block A, Plan M-26 and including all of Plan M-142

   

Parts of 125, 126, 127, 129, 132 and 133

III.

(Plan of the Township of Sandwich East)

All of 125, 126, 127, 134 and 135

IX.

(Plan of the Township of Sandwich South)

Parts of 14 to 18, both inclusive

   

All of Lot 19

O. Reg. 535/91, s. 1.

SCHEDULE 2
CEDAR, WIGLE AND MILL CREEKS

That part of the watersheds of Cedar, Wigle and Mill Creeks in the Town of Kingsville and the townships of Gosfield South and Colchester South, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER2-1 to ER2-26, inclusive, and identified by a stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

Concession

Lot

Front Concession, Western Division, in the Town of Kingsville

Parts of 1 to 4, both inclusive

Front Concession, Western Division (Plan of the Township of Gosfield South)

Parts of 4 to 32, both inclusive

4th Section, Western Division (Plan of the Township of Gosfield South)

Parts of 4, 5, 7, 8, 9, 10, 16 and 17

Front Concession, Eastern Division (Plan of the Township of Gosfield South)

Parts of 1 to 6, both inclusive

I.

Parts of 33 to 39, both inclusive

(Plan of the Township of Colchester South)

 

II.

Parts of 17 to 19, both inclusive

(Plan of the Township of Colchester South)

 

III.

Parts 14 to 19, both inclusive

(Plan of the Township of Colchester South)

 

IV.

Parts of 13 to 19, both inclusive

(Plan of the Township of Colchester South)

 

O. Reg. 535/91, s. 2.

SCHEDULE 3
PIKE CREEK, PUCE RIVER, FOURTH CONCESSION DRAIN, BELLE RIVER, DUCK CREEK, MOISON CREEK AND RUSCOM RIVER

That part of the watersheds of Pike Creek, Puce River, Fourth Concession Drain, Belle River, Duck Creek, Moison Creek and Ruscom River in townships of Sandwich South, Maidstone, Rochester and Gosfield North, the Village of St. Clair Beach and the Town of Belle River, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER3-1 to ER3-16, inclusive, ER3-18, ER3-20, ER3-21, ER3-22, ER3-24, ER3-24a, ER3-25, ER3-26, ER3-28, ER3-29, ER3-30, ER3-31, ER3-32, ER3-34, ER3-35, ER3-36, ER3-37, ER3-39 to ER3-45, inclusive, ER3-47, ER3-48, ER3-50, ER3-51 and ER3-52, and identified by a stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

Concession

Lot

X.

Parts of 9 to 13, both inclusive

(Plan of the Township of Sandwich South)

 

XI.

Parts of 9 to 19, both inclusive

(Plan of the Township of Sandwich South)

 

XII.

Parts of 9 to 20, both inclusive

(Plan of the Township of Sandwich South)

 

North Talbot Road Concession (Plan of the Township of Sandwich South)

Parts of 292 to 297, both inclusive

West Pike Creek Concession (Village of St. Clair Beach)

Parts of Gore Lot, 1 and 2

West Pike Creek Concession (Plan of the Township of Maidstone)

Parts of 1 to 10, both inclusive

East Pike Creek Concession (Plan of the Township of Maidstone)

Parts of 1 to 10, both inclusive

North Middle Road Concession (Plan of the Township of Maidstone)

Parts of 1, 2, 11, 12 and 22

South Middle Road Concession (Plan of the Township of Maidstone)

Parts of 1, 2, 11, 12 and 19 to 22, both inclusive

North Talbot Road Concession (Plan of the Township of Maidstone)

Parts of 292, 293 and 294

West Puce River Concession (Plan of the Township of Maidstone)

Parts of B and 1 to 7, both inclusive

East Puce River Concession (Plan of the Township of Maidstone)

Parts of 1 to 7, both inclusive

Concession between the Belle River

Parts of 1 to 3, both inclusive

Concession and the East Puce River

 

Concession fronting on Lake St. Clair

 

(Plan of the Township of Maidstone)

 

I.

Parts of A, 1 to 20 and Part of 22, and 24 to 29, all inclusive

(Plan of the Township of Maidstone)

 

II.

Parts of 11, 12 and 24

(Plan of the Township of Maidstone)

 

III.

Part of 11

(Plan of the Township of Maidstone)

 

I.

Part of 11

(Plan of the Township of Maidstone)

 

V.

Parts of 11 to 19, both inclusive, and Part of 24

(Plan of the Township of Maidstone)

 

VIII.

Parts of 11 and 12

(Plan of the Township of Maidstone)

 

IX.

Parts of 11 and 19

(Plan of the Township of Maidstone)

 

I.

Part of A, 2 and 3

West of Belle River in the Town of Belle River

All of 1

I.

Part of A and 1

East of Belle River in the Town of Belle River

Parts of 2 and 3

Lakeshore Range Concession (Plan of the Township of Rochester)

Parts of 1 to 8, both inclusive

West Ruscom River Concession

Parts of A and 3 to 8, both inclusive

(Plan of the Township of Rochester)

All of 1 and 2

East Ruscom River Concession (Plan of the Township of Rochester)

Parts of A, 1, 2, 3 and 4 to 8, all inclusive

North Middle Road Concession

Parts of 1, 3, 4, and 9 to 13, both inclusive

(Plan of the Township of Rochester)

All of 14 to 17, both inclusive

South Middle Road Concession (Plan of the Township of Rochester)

Parts of 1, 4, 9 to 11, both inclusive, and 15 to 17, both inclusive

 

All of 12 to 14, both inclusive

I.

Parts of A, 1 to 20, both inclusive, and 25 to 30, both inclusive

(Plan of the Township of Rochester)

 

II.

Parts of 11 and 12

(Plan of the Township of Rochester)

 

III.

Parts of 11 and 12

(Plan of the Township of Rochester)

 

IV.

Parts of 12, 15 to 17, both inclusive

(Plan of the Township of Rochester)

Parts of 28 to 30, both inclusive

V.

Parts of 12 to 15, and 26 to 28, all inclusive

(Plan of the Township of Rochester)

 

VI.

Parts of 13, 15 to 21 and 25 to 30, all inclusive

(Plan of the Township of Rochester)

 

VII.

Parts of 12, 13 and 25 to 30, all inclusive

(Plan of the Township of Rochester)

 

VIII.

Part of 29

(Plan of the Township of Rochester)

All of 30

North Talbot Road Concession (Plan of the Township of Gosfield North)

Part of 270

VII.

Parts of 15 to 20 and 23 to 25, all inclusive

(Plan of the Township of Gosfield North)

 

VIII.

All of 12 and 13 to 25, all inclusive

(Plan of the Township of Gosfield North)

 

IX.

Parts of 12 to 17, and 19 to 21, all inclusive

(Plan of the Township of Gosfield North)

 

X.

Parts of 13 to 16, both inclusive, and 19 to 25, both inclusive

(Plan of the Township of Gosfield North)

 

XI.

Parts of 12 to 14, 20 and 21 to 25, all inclusive

(Plan of the Township of Gosfield North)

 

O. Reg. 535/91, s. 2.

SCHEDULE 4
STURGEON CREEK AND SELKIRK DRAIN

That part of the watersheds of Sturgeon Creek and Selkirk Drain in the Town of Leamington and the Townships of Mersea and Gosfield South, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER4-1 to ER4-6, inclusive, and identified by a stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

Concession

Lot

A.

Parts of 11 and 12

(Plan of the Township of Mersea)

 

B.

Parts of 10 and 11

(Plan of the Township of Mersea)

 

I.

Parts of 7, 8 and 10 to 12, all inclusive

(Plan of the Township of Mersea)

 

III.

Parts of 1 to 6, both inclusive

(Plan of the Township of Mersea)

 

South Talbot Road Concession (Plan of the Township of Mersea)

Parts of 236 to 240, both inclusive

North Talbot Road Concession (Plan of the Township of Mersea)

Parts of 238 to 240 and 242 to 244, all inclusive

North Talbot Road Concession (Plan of the Town of Leamington)

Parts of 243 and 244

III.

Part of 13

(Plan of the Township of Gosfield South)

 

Broken Front Concession (Plan of the Township of Mersea)

Parts of 7 and 8

O. Reg. 535/91, s. 2.

SCHEDULE 5
CANARD RIVER AND BIG CREEK

That part of the watersheds of Canard River and Big Creek in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER5-1 to ER5-18, inclusive, ER5-20 to ER5-29, inclusive, ER5-31 to ER5-49, inclusive, ER5-49A, ER5-50, ER5-52 to ER5-59, inclusive, and ER5-61 to ER5-67, inclusive, and identified by a stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

1. In the Township of Malden, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Parts of 5 to 19, both inclusive

II.

Parts of 20, 21 and 24

III.

Parts of 25 to 32, both inclusive

 

All of 33

 

Part of Caldwell Grant

IV.

Parts of 34, 36, 37 and 38

 

All of 35

V.

Parts of 52, 53 and 54

 

All of 55 and 56

VI.

Parts of 57, 58 and 63

VII.

Parts of 59, 60, 77 and 78

VIII.

Parts of 89 to 94

IX.

Part of 96

 

All of 97 to 101, both inclusive

2. In the Township of Anderdon, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Parts of 28 to 42, both inclusive

II.

Parts of 1 to 4 and 10 to 14, all inclusive

III.

Parts of 1, 4 to 10, both inclusive, and 14

IV.

Parts of 3 to 7, both inclusive, and 11 to 14, both inclusive

V.

Parts of 1 to 4, both inclusive, and 9 to 14, both inclusive

VI.

Parts of 1, 2, 5 to 10, both inclusive, 12, 13 and 14

VII.

Parts of 4 to 8, both inclusive, 11 and 12

VIII.

Parts of 1 to 6, both inclusive, 8, 11, 12 and 13

3. In the Township of Sandwich West, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Parts of 1 to 29, both inclusive

II.

Parts of 1 to 34, both inclusive

III.

Parts of 1 to 6, both inclusive

IV.

Parts of 4 to 6, both inclusive

V.

Parts of 1 and 2

VI.

Parts of 1, 2 and 3

VII.

Parts of 1 and 2

VIII.

Part of 1

4. In the Township of Colchester North, County of Essex, and being comprised of the following lots:

Concession

Lot

South Malden Road

Parts of 1, 2 and 3, 6 to 33, all inclusive

North Malden Road

Parts of 1 to 11, both inclusive, and 20 to 31, both inclusive

VII.

Parts of 3 to 9, both inclusive

VIII.

Parts of 7 to 13, both inclusive, and 18 to 21, both inclusive

IX.

Parts of 12, 13 and 17 to 21, both inclusive

X.

Parts of 1 to 4 and 17 to 21, all inclusive

XI.

Parts of 1 to 5

XII.

Parts of 1 to 5 and 11 to 15, all inclusive

XIII.

Parts of 1 to 5, both inclusive, and 13 to 17, both inclusive

XIV.

Parts of 1 to 5, both inclusive, and 14 to 17, both inclusive

O. Reg. 535/91, s. 3.

SCHEDULE 6
TURKEY CREEK

That part of the watershed of Turkey Creek in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER6-1 to ER6-13, inclusive, ER6-14, ER6-15A, ER6-15B, ER6-16, ER6-17, ER6-18, ER6-19, ER6-20, ER6-21A, ER6-21B, ER6-22 to ER6-33, inclusive, ER6-34A, ER6-34B, ER6-35 and ER6-36, and identified by the stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

1. In the City of Windsor, County of Essex, and being comprised of the following lots:

Concession

Lot

II.

Parts of 44 to 55, both inclusive, and 71 to 109, both inclusive

III.

Parts of 63 to 78, both inclusive, and 81 to 102, both inclusive

IV.

Parts of 1 to 5, both inclusive

North of Talbot Road

Parts of 306 to 308, both inclusive

2. In the Township of Sandwich West, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Parts of 30 to 45, both inclusive

II.

Parts of 33 to 40, both inclusive

IV.

Parts of 1 and 2

O. Reg. 535/91, s. 3.

SCHEDULE 7
HILLMAN MARSH AND MUDDY CREEK

That part of the watersheds of Hillman Marsh and Muddy Creek in the Township of Mersea, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER7-1 to ER7-6, and identified by the stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

Concession

Lot

I.

Parts of 18 to 22, both inclusive

(Plan of the Township of Mersea)

 

II.

Parts of 16 to 22, both inclusive

(Plan of the Township of Mersea)

 

III.

Part of 19

(Plan of the Township of Mersea)

 

IV.

Parts of 22 to 24, both inclusive

(Plan of the Township of Mersea)

 

South Talbot Road (Plan of the Township of Mersea)

Parts of 221 to 223 and 225 to 235, all inclusive

North Talbot Road (Plan of the Township of Mersea)

Parts of 223 and 227 to 230 and 235, 236, all inclusive

O. Reg. 535/91, s. 4.

SCHEDULE 8
LAKE ERIE, DETROIT RIVER AND LAKE ST. CLAIR

That part of the watersheds of Lake Erie, the Detroit River and Lake St. Clair, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER8-1, ER8-2, ER8-5, ER8-8, ER8-9, ER8-14 to ER8-20, inclusive, ER8-23, ER8-27 to ER8-33, inclusive, ER8-35, ER8-38, ER8-43, ER8-44, ER8-45, ER8-46, ER8-47, ER8-48, ER8-50 to ER8-64, inclusive, ER8-64a, ER8-64b, ER8-65, ER8-65a, ER8-66, ER8-66a, and ER8-67 to ER8-75, inclusive, and identified by the stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

1. In the Township of Mersea, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot 1

II.

Part of the Lot 23 and 24

III.

Part of Lot 22

A.

Part of Lot 22

B.

Part of Lot 11 and 21

C.

Part of Lot 12, 13 and 21

D.

Part of Lot 13 to 21, all inclusive

Broken Front Concession

Part of Lot 1 to 6 and 9 to 12, all inclusive

2. In the Town of Leamington, County of Essex, and being comprised of the following lots:

Concession

Lot

Broken Front Concession

Part of Lot 6 to 8, all inclusive

3. In the Township of Gosfield South, County of Essex, and being comprised of the following lots:

Concession

Lot

Front Concession Eastern Division

Part of Lot 3 to 13, all inclusive

Front Concession Western Division

Part of Lot 5 to 32, all inclusive

4. In the Town of Kingsville, County of Essex, and being comprised of the following lots:

Concession

Lot

Front Concession Eastern Division

Part of Lot 1 and 2

Front Concession Western Division

Part of Lot 1 to 5, both inclusive

5. In the Township of Colchester South, County of Essex, and being comprised of the following lots:

Concession

Lot

Front Concession

Part of Lot 33 to 97, all inclusive

6. In the Township of Malden, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot 5 to 19, all inclusive

V.

Part of Lot 56

VI.

Part of Lot 57 and 58

VII.

Part of Lot 59 and 60

Plan of the Township of Malden

Part of the Caldwell Grant, including Registered Plans 1103, 1379, 1131, 1191, 795

7. In the Town of Amherstburg, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

(formerly Malden Township)

Part of Lot 1 to 4

I.

(formerly Anderdon Township)

Part of Lot 1 to 5

8. In the Township of Anderdon, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot 5 to 42

9. In the Township of Sandwich West, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot 1 to 40, all inclusive

10. In the City of Windsor, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

(formerly Sandwich West)

Part of lot 40 to 128, 129E, 129W and 130 to 149, all inclusive

11. In the Town of Tecumseh, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot 150 to 156, all inclusive

12. In the Village of St. Clair Beach, County of Essex, and being comprised of the following lots:

Concession

Lot

West Pike Creek

Part of A, 1 and 2

13. In the Township of Maidstone, County of Essex, and being comprised of the following lots:

Concession

Lot

West Pike Creek

Part of Lot 2 and 3, all inclusive

All of Broken Front Concession

All lots

East Pike Creek

Part of Lot 1 to 3, all inclusive

Concession between Pike Creek and Puce River fronting on Lake St. Clair

Part of Lot 1 to 4, all inclusive

West Puce River

All of Lot B, Part of Lot 1 and 2

East Puce River

All of Lot B and Lot 1, Part of Lot 2 and 3

Concession between Belle River and Puce River fronting on Lake St. Clair

Part of Lot 1 to 3, all inclusive

I.

All of Lot 1, Part of Lot A and 2

14. In the Town of Belle River, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

West of Belle River

Part of A

I.

East of Belle River

Part of A

15. In the Township of Rochester, County of Essex, and being comprised of the following lots:

Concession

Lot

I.

Part of Lot A and Lot 1

West Ruscom River

All of Lot A, Lot 1, 2, Part of Lot 3

Concessions between Ruscom River and Belle River fronting on Lake St. Clair

Part of Lot 1 to 8, all inclusive

East of Ruscom River

Part of Lot A and Lot 1 to 3, all inclusive

16. In the Township of Tilbury North, County of Essex, and being comprised of the following lots:

Concession

Lot

Broken Front Concession

Part of Lot 1 to 8, all inclusive

 

All of lot 9 to 15, all inclusive

O. Reg. 535/91, s. 4.

SCHEDULE 9
LITTLE CREEK

That part of the watershed of Little Creek in the Township of Tilbury North, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER9-1, ER9-2 and ER9-3, and identified by the stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

Concession

Lot

I.

(Plan of the Township of Tilbury North)

Part of 11 and 12, both inclusive

II.

(Plan of the Township of Tilbury North)

Part of 11 and 12, both inclusive

III.

(Plan of the Township of Tilbury North)

Part of 11 and 12, both inclusive

IV.

(Plan of the Township of Tilbury North)

Part of 11 and 12, both inclusive

O. Reg. 535/91, s. 4.

SCHEDULE 10
LAKE ERIE — PELEE ISLAND

That part of the watershed of Lake Erie in the Township of Pelee, in the County of Essex, that affects the following lots, as shown delineated by fill lines on the maps filed in the Regional Office of the Ministry of Natural Resources at London, Ontario as Maps ER10-1 to ER10-10, inclusive, and identified by the stamp of the Registrar of Regulations dated the 23rd day of January, 1991:

— All of lots 50 to 52, Registered Plan 338

— All of beach lots ‘A’ to ‘H’, Registered Plan 338

— Part of lots 1, 46, Registered Plan 338

— All of Registered Plan 459

— All of lots ‘M’ to ‘O’, Registered Plan 1240

— All of lots ‘P’ to ‘R’, Registered Plan 1499

— All of lots 70, 367 to 385, Registered Plan 35

— Part of lots 1 to 8, 14, 15 to 21, 23, 27, 29, 30 to 33, 34 to 41, 69, Registered Plan 35

— All of Registered Plan 1011

— Part of lots 15 and 25, Registered Plan 384

— Part of lots 3 to 5, Registered Plan 228

— Part of Block ‘C’, Registered Plan 1180

— All of Registered Plan 1534

— Part of Lot 10, Registered Plan 494

— All of beach lots ‘A’ to ‘D’, Registered Plan 328

— Part of lots 1, 2 and 5, Registered Plan 328

— All of lots 20-9, 20-12, 20-15, 20-17, 20 to 30, Registered Plan 1333

— All of lots 1 to 20, 20-3, 20-4, Registered Plan 438

O. Reg. 535/91, s. 4.