O. Reg. 392/07: Smart Meters: Cost Recovery

filed July 26, 2007 under Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Sched. B

Skip to content

 

ontario regulation 392/07

made under the

Ontario Energy Board Act, 1998

Made: March 28, 2007
Filed: July 26, 2007
Published on e-Laws: July 27, 2007
Printed in The Ontario Gazette: August 11, 2007

Amending O. Reg. 426/06

(Smart Meters: Cost Recovery)

1. Section 2 of Ontario Regulation 426/06 is amended by adding the following subsections:

(4.1) Subsection (1) does not prevent a distributor from recovering costs, if approved by the Board, that the distributor incurred as a result of supporting the IESO with finalizing the design of the requirements and processes for the interface and integration of the Smart Metering Entity’s system with the distributor’s billing and metering systems.

(4.2) The distributor’s cost recovery under subsection (4.1) is subject to the Board receiving confirmation from the IESO that the distributor supported the IESO as described in subsection (4.1) and that the distributor was one of the first five distributors whose billing and metering systems were integrated with the Smart Metering Entity’s system.