Building permits
About building permits
A building permit is a document issued by the body responsible for enforcing Ontario’s Building Code in your area. A building permit is necessary when you wish to construct, renovate, demolish or change the use of a building.
Building Code enforcement, including issuing building permits, is generally carried out by municipal building departments, although in the case of on-site sewage systems, enforcement in some areas is conducted by boards of health and conservation authorities.
Why you need a building permit
Building permits allow your municipality to protect the interests of both individuals and the community. By reviewing and approving building permit applications before any work is done, the municipality can ensure that buildings comply with:
- the Building Code, which sets standards for the design and construction of buildings to meet objectives such as health, safety, fire protection, accessibility and resource conservation
- the local zoning bylaw and other planning controls on buildings
- other applicable legislation, including conservation authority approvals and certain requirements under the Environmental Protection Act
When to get a building permit
You must obtain a building permit before you:
- construct any new building over ten square meters in area or place another structure, such as a mobile home, on your property
- make renovations or repairs or add to a building
- change the use of a building
- excavate or construct a foundation
- construct a seasonal building
- undertake work regarding the installation, alteration, extension or repair of an on-site sewage system
- contact your municipality if you have any questions about when a building permit may be required.
How to apply for a building permit
You can get an application for a building permit from your municipality or from the Ministry of Municipal Affairs and Housing’s website. Note that building permit applications are submitted to your municipality, not to the provincial government.
When you apply, you'll have to attach drawings, plans, and other documents. You may also have to pay a fee.
It’s a good idea to talk to staff at your municipality’s building department before you apply. They can tell you what information, drawings and plans you'll have to include with the application and whether you'll need any other permits or approvals.
How your application is reviewed
Staff at your municipality will review your application to confirm that the proposed work complies with the Building Code and other applicable laws set out in the Building Code, such as local zoning bylaws. They may send your application to other local/municipal officials for comments.
Applications for a simple alteration or addition can be processed fairly quickly, but more complex proposals can take longer. The Building Code requires that a municipality review a complete permit application within a certain timeframe when the application meets the criteria set out in the Code. For example, the timeframe on a permit application for a house is 10 days. For a more complex building, such as a hospital, the timeframe is 30 days. Within this timeframe, a municipality must either issue the permit, or refuse it and provide all reasons for refusal.
To be issued a permit, the proposed construction must comply with the Building Code and applicable laws set out in the Building Code. If you need a zoning change or a minor variance from the zoning bylaw (municipal zoning is considered applicable law), or if the proposed construction does not comply with the Building Code, a permit will not be issued until the zoning change or minor variance has been obtained, or once the proposed construction complies with the Building Code.
If your property is covered by a site plan control bylaw, you may not get a building permit until the plans and drawings have been approved by the municipality. See Zoning bylaws, No. 3 in the series, for more information about zoning, minor variances, and site plan controls.
What you can do if your application is refused
If your municipality refuses your building permit application, you will be told why. If you are unable to resolve the issues with your municipal building department, you have options for appealing their decision.
If the problem relates to technical requirements set out in the Building Code, you may appeal to the Building Code Commission. The Building Code Commission is an independent adjudicative tribunal of the provincial government whose mandate is to hear disputes related to compliance with the technical requirements of the Building Code.
If the problem relates to compliance with other applicable laws, such as interpretation of the zoning bylaw, you can appeal to a judge of the Superior Court of Justice, who will review the matter. However, you may want to consult a lawyer first.
Construction inspections
The Building Code sets out the stages of construction when different types of buildings must undergo a mandatory inspection. It is the responsibility of the permit holder to contact the municipality for an inspection when the project is at a stage of construction, as set out in the Building Code (for example, footings, structural framing,). The municipal building official is required to carry out the inspection within two working days of being notified. For construction of a sewage system, the inspector has five working days to conduct the inspection. During the inspection, an inspector will examine the work to determine if it is carried out in accordance with the Building Code, your permit, and the approved plans.
You will also be required to:
- show your permit in a window or other place where it can be easily seen
- keep copies of the plans on the site
- tell the municipality about any changes to the proposed construction, which will also have to be approved by the municipality
The inspector must always be able to see the work. If the work is different from what was approved and you do not have permission for a revision to your plans, you will be told to correct it. If you don't, the municipality can take enforcement action, such as issuing orders authorized under the Building Code Act, 1992.
Demolition permits
Before you take down all or part of a building, you will have to apply to your municipality for a demolition permit. The process is similar to getting a building permit, but some special situations may affect your application.
In a demolition control area, for example, you will not be able to demolish a residential property until you have received a demolition permit issued by the municipal council.
You may require a separate heritage approval from the municipality, or the Ontario Heritage Trust, including a heritage approval for the demolition of a building or structure located on the property, if your property is:
- designated under the Ontario Heritage Act,
- located in a heritage conservation district, or
- subject to a heritage conservation easement (a legal agreement to protect heritage elements that applies to anyone who owns the land).
If your property is not designated, but is included on a municipal heritage register, the Ontario Heritage Act requires that the property owner provide municipal council 60 days notice of their intention to demolish or remove a building or structure, located on the property.
How to change a building’s use
If you want to change the way you use all or part of a building, you may need a change of use permit, even if you're not planning any construction. A building evaluation may be required to ensure that the existing building can safely accommodate the proposed use, as different uses have different Building Code requirements.
Call your municipal building department to find out whether you will need a change of use permit.
Consequences for violating the Building Code Act, 1992
An individual who is charged and found guilty of an offence under the Building Code Act, 1992, such as building without a permit, can be fined up to $50,000 for a first offence and up to $100,000 for subsequent offences. For a corporation, a first offence could result in a maximum fine of $500,000 and $1,500,000 for subsequent infractions.
Failure to comply with an order from the municipal building department is also an offence under the Building Code Act, 1992.
Other approvals that may be required
In addition to the planning approvals and building permit required for a building project, other permits and approvals may also be needed in certain situations, such as those required under the Ontario Heritage Act, Conservation Authority and Ministry of Transportation. These approvals are considered applicable law and generally, the applicable laws set out in the Building Code must be complied with before a building permit can be issued.
How you can find out more
For more information about building permits in your community, contact your municipal building department. For more information about land use planning in Ontario, contact your nearest Municipal Services Office.