Introduction

The Regulation for Health Care and Residential Facilities (O. Reg. 67/93, s. 19) made under the Occupational Health and Safety Act (OHSA) requires that mechanical ventilation systems in the workplaces to which the regulation applies be inspected by a qualified person at least every six months. It also requires that a report on each inspection be filed with the employer and with the joint health and safety committee (JHSC) or the health and safety representative (HSR), if any.

This guide provides an overview of the inspection, service, and maintenance of ventilation systems to help employers and persons carrying out these tasks determine how to comply with the requirements of the regulation and achieve a healthier workplace.

The two major types of mechanical ventilation systems, namely general ventilation (also known as heating, ventilating and air-conditioning – HVAC) and local exhaust ventilation are discussed in this guidance document.

Who is qualified to conduct the inspection?

The inspection must be carried out by a person who is qualified by training and experience to do so. The person may be a worker in maintenance or some other area of the facility who has detailed knowledge of the system, its operation, and maintenance requirements. A qualified contractor with expertise in ventilation systems who is familiar with the system may also be qualified to conduct the inspection.

Keeping records

Information about each ventilation system should be recorded and kept readily available at the workplace. The record should include but is not limited to:

  • the system's purpose, type, and the area(s) it serves
  • relevant plans, drawings and specifications
  • the manufacturer's literature for all operating equipment
  • written standard operating procedures
  • a written testing and/or preventive maintenance program
  • testing and maintenance records, including reports of regular inspections by a qualified person
  • emergency procedures to be followed when a toxic substance has been released and could enter the ventilation system, and
  • references to applicable best practices, standards (e.g. Canadian Standards Association) and codes.

For an air supply or re-circulating HVAC system, the records should include descriptions of:

  • the location of outdoor air intakes (components may include bird screen, outdoor air intake louvers and dampers) and air handling units
  • air volumes and the percentage of outdoor air
  • how the percentage of outdoor air is determined
  • how fans, outdoor air dampers, exhaust dampers, supply diffuser dampers, temperature, humidity and air distribution are controlled
  • type(s) of heating and/or cooling systems, if any
  • type(s) of filters and their maintenance schedule, and
  • maintenance programs for fan components, drive components, drain pans, traps, valves, nozzles, dampers and controls (including any continuous monitors of contaminant concentrations). Maintenance programs and records should state the type of biocide used and how frequently it is used.

Employers often find it helpful to keep a log or record of indoor air quality complaints and associated conditions. Local exhaust ventilation systems generally have four basic components: hood(s), duct network (including the exhaust duct, discharge stack and/or recirculation duct), air cleaning device and fan. The records for these systems should include descriptions of:

  • hazardous substances (e.g., chemical and biological agents) and the operation(s) to be controlled
  • number of hoods and their design
  • construction material compatibility requirements
  • rate of air exhausted for each hood and for the overall system
  • location of dampers, if any
  • flow monitors (e.g., hood static pressure gauges)
  • type of air cleaning device, if any
  • equipment failure alarms, if any
  • duct materials
  • fan type and materials, and
  • the height and location of the discharge stack.

The inspection

A good way to help ensure that a ventilation system is operating properly is by regularly checking and directly measuring air flow rates/velocities at appropriate points.

For laboratory ventilation (e.g., laboratory hoods), flow rate or face velocity measurements are good indicators of system performance. For a local exhaust ventilation system, hood static pressure measurements can also serve well. Details of how and where to measure air flow may be obtained from ventilation references, such as the Industrial Ventilation: A Manual of Recommended Practice for Design, 31st ed., 2023 published by the American Conference of Governmental Industrial Hygienists (ACGIH).

For ongoing ventilation system effectiveness, regular inspections under a preventive maintenance program are necessary. Inspection is needed to ensure the integrity, cleanliness and proper operation of the system. The ventilation system must be inspected at least once every six months. Refer to “the semi-annual inspection checklist“ for a list of ventilation system components to be checked.

The semi-annual inspection checklist

Here is a list of recommended ventilation system components to be checked during a semi-annual inspection:

Airborne Infection Isolation rooms (AIIR)

  • air flow from clean areas to less clean areas
  • pressure differential between areas (minimum of 0.03 inch of water gauge/ 7.5 Pascals)
  • monitoring and alarm of room pressure
  • High efficiency particulate air (HEPA) filtration of exhaust in airborne infection isolation rooms

Exhaust fume hoods (e.g., laboratory hoods)

  • physical integrity
  • blast gate and damper settings
  • face velocity with the sash at normal operating height
  • flow visualization (smoke tube test)
  • signs of plugging, blockage
  • unusual noise

Outdoor air intake

  • location in relation to exhausts (should be at least 15 feet/4.7 metres apart) and other outdoor potential sources of air contaminants
  • dryness and cleanliness
  • operation of motorized dampers
  • standing water, bird droppings in vicinity

Air filters

  • type of filters
  • filter efficiency
  • cleanliness of filters
  • signs of bypassing
  • change-out schedule

Ductwork

  • physical integrity
  • dryness and cleanliness
  • signs of blockage from static pressure measurements
  • air balancing record

Reheat coils/mixing boxes

  • dryness and cleanliness
  • VAV (variable air volume) calibration set for at least the minimum volume
  • required outside air delivery at all times

HVAC equipment (e.g., heating/cooling units, stacks and condensers)

  • physical integrity
  • dryness and cleanliness
  • no slime, mould, dirt, bird droppings or soot accumulations
  • integrity and cleanliness of chamber floor, wall and ceiling surfaces
  • cleanliness and operation of various components

Supply air diffusers, return air grilles

  • cleanliness
  • no obstruction
  • air balancing record

Supply air fan

  • correct direction of rotation and adequate rotations per minute (rpm)
  • static pressure drop across fan, if practicable
  • pulley/belt tightness and wear
  • guards in place
  • assembly intact and clean
  • minimal vibration
  • acceptable noise level
  • no loose nuts and bolts
  • adequate bearing lubrication (as indicated by temperature and vibration)
  • electrical connections and insulation intact
  • fan wheel correctly mounted and not worn or dirty
  • couplings and alignment for direct drive fans

Humidifiers, cooling coils, drain pans

  • cleanliness
  • no slime or mould build-up
  • drains clear and free-flowing
  • no stagnant water accumulations
  • no odours
  • biocide treatment, where necessary

Cooling tower

  • proper and unobstructed drainage
  • clean sump
  • no leaks or overflow
  • no slime or algae
  • mist eliminators working with no carryover
  • no stagnant water during non-operating season
  • overall cleanliness – no bird droppings, slime, mould or dirt build-up

Thermostats

  • type and location
  • set appropriately
  • access controlled

Note:

  1. Inspect internal fan components only when the fan is off and locked out.
  2. The replacement air must meet certain requirements. These requirements are found in section 20 of the Regulation for Health Care and Residential Facilities.
  3. To prevent blockage or contamination of air intakes, more frequent inspection of these system components may be necessary.

The report and follow-up

The person conducting the semi-annual inspection is required to file a report with the employer and with the joint health and safety committee (JHSC) or the health and safety representative (HSR), if any. It is recommended that the report states what was inspected, when and by whom. It should describe any deficiencies observed during the inspection. If deficiencies are found, action shall/must be taken to correct them. As per O Reg 67/93: Health Care and Residential Facilities, s. 19 (5) (b):

A mechanical ventilation system,

(b) shall be serviced, have maintenance work performed on it or be repaired when a report referred to in subsection (4) indicates it is necessary to ensure the system is maintained in good condition.

Deficiencies and the corrective action(s) should be documented in the system records.

O. Reg. 67/93: Health Care and Residential Facilities, s. 19 (5) requires mechanical ventilation system:

  • to be serviced and maintained as frequently as recommended by the manufacturer, and
  • to be serviced and maintained — or to be repaired — when a report referred to in subsection (4) indicates that this is necessary.

This resource does not replace the Occupational Health and Safety Act (OHSA) and its regulations and should not be used as or considered legal advice. Health and safety inspectors apply and enforce these laws based on the facts they find in the workplace.