Overview

The Building Materials Evaluation Commission:

  • examines or authorizes the examination of materials, systems and building designs for construction
  • attaches conditions for its use when authorizing materials, systems and building designs (if needed)
  • makes recommendations to the minister regarding changes to the Building Code Act or Building Code

List of authorizations

Request a copy of the authorization by emailing codeinfo@Ontario.ca

Authorization
number
ProductApplicantCategoryAuthorization issuedAuthorization expiry
BMEC 24-06-417XL Shelter MembraneAll Cover Portable System/XL SheltersRoof coveringOctober 30, 2024October 30, 2029
BMEC 24-05-416The PowerShield® MembraneLes Industries Harnois Inc.Roof coveringOctober 30, 2024October 30, 2029
BMEC 24-04-415Quad Close Trap Seals models: 2692-02, 2692-03, 2692-0350 and 2692-04Jay R. Smith Mfg. Co.PlumbingOctober 30, 2024October 30, 2029
BMEC 24-03-414IPEX Single and Double Apartment FittingsIPEX Management Inc.PlumbingJune 26, 2024June 26, 2029
BMEC 24-02-413MST-BAR Structural RebarMST Rebar Inc.StructuralJune 26, 2024June 26, 2029
BMEC 24-01-412MaxLiner® SystemMaxLiner, LLCPlumbingFebruary 28, 2024February 28, 2029
BMEC 23-09-411NEXT Supply Press-Connect Copper FittingsNEXT Plumbing and Hydronics Supply Inc.PlumbingOctober 25, 2023October 25, 2028
BMEC 23-08-410Infiltrator ATL SystemInfiltrator Water TechnologiesSeptic systemOctober 25, 2023October 25, 2028
BMEC 23-07-409CB Supplies Ltd.’s Copper & Brass Press FittingsCB Supplies Ltd.PlumbingSeptember 27, 2023September 27, 2028
BMEC 23-06-408System O)) – Nested Pipe ConfigurationDBO Expert Inc.Septic systemJuly 26, 2023July 26, 2028
BMEC 23-05-407System O)) – Standard Configuration DBO Expert Inc.Septic system July 26, 2023July 26, 2028
BMEC 23-04-406FORMADRAIN® Linings for Trenchless Pipe Rehabilitation (CIPP)FORMADRAIN Inc.PlumbingJune 28, 2023June 28, 2028
BMEC 23-03-405Cello Products Inc.’s Copper Press FittingsCello Products Inc.PlumbingJune 28, 2023June 28, 2028
BMEC 23-02-404Ecoflo linear biofilter EL30 model seriesPremier Tech Water and EnvironmentSeptic SystemMay 24, 2023May 24, 2028
BMEC 23-01-403VIPERT™ Potable Water TubingCB Supplies Ltd.PlumbingFebruary 22, 2023February 22, 2028
BMEC 22-06-402NAPCORE™ Cellular Core PVC DWV PipeWestlake Pipe & FittingsPlumbingSeptember 28, 2022September 28, 2027
BMEC 22-05-401ProPress®.Viega LLCPlumbingJuly 27, 2022July 27, 2027
BMEC 22-04-400ApolloPress® FittingsElkhart Products CorporationPlumbingMay 25, 2022May 25, 2027
BMEC 22-03-399HydroMax™ Siphonic Roof Drainage SystemMIFAB Inc.PlumbingApril 27, 2022April 27, 2027
BMEC 22-02-398SureSeal® Floor Drain Trap SealsRectorSealPlumbingFebruary 23, 2022February 23, 2027
BMEC 22-01-397Press-Fit Wrought Copper FittingsBMI Canada Inc.PlumbingJanuary 26, 2022January 26, 2027
BMEC 20-04-396CuraFlo Engineering Flow Lining System®CuraFlo Technologies LLC.PlumbingNovember 25, 2020November 25, 2025
BMEC 20-03-395Eljen™ GSF SystemEljen CorporationSeptic SystemOctober 28, 2020October 28, 2025
BMEC 20-02-394Peaked Roof Rounded Eave (PRRE) Steel Framed Fabric Covered Building SystemNorseman Structures, A division of Norseman Inc.Roof Covering SystemJune 24, 2020June 24, 2025
BMEC 20-01-393Performance Liner® Cured-In-Place Lateral Pipe Lining SystemLMK Technologies LLCPlumbingMarch 25, 2020March 25, 2025