Complex building syllabus
The Building Code
The exam covers the following sections of the Building Code.
Division A – Compliance, Objectives and Functional Statements, as follows:
- Part 1 – Compliance:
- except 1.3.3.2A. Application of Part 8
- Part 2 – Objectives
- Part 3 – Functional Statements
Division B – Acceptable Solutions, as follows:
- Part 1 – General:
- except 1.1.3.2. Depth of Frost Penetration
- Part 2 – Farm Buildings, only:
- 2.1.1. Scope
- 2.1.2. Application
- 2.1.4. Classification of Farm Buildings by Major Occupancy
- 2.2.1. General
- 2.2.2. Building Size and Construction Relative to Major Occupancy
- 2.2.3. Fire Alarm and Detection Systems
- 2.2.4. Provisions for Firefighting
- 2.2.5. Emergency Lighting
- 2.2.6. Safety within Farm Buildings
- 2.2.7. Exits
- 2.2.8. Hazardous Substances, Processes and Equipment
- Part 3 – Fire Protection, Occupant Safety and Accessibility
- Part 4 – Structural Design, as follows:
- 4.1. Structural Loads and Procedures, only:
- 4.1.5.14. Loads on Guards and Handrails
- 4.1.5.16. Loads on Walls Acting As Guards
- 4.1.5.17. Firewalls
- Part 5 – Environmental Separation
- Part 6 – Heating, Ventilating and Air- Conditioning, as follows:
- 6.2. Design and Installation
- 6.3. Ventilation Systems, only:
- 6.3.2.3. Materials in Air Duct Systems
- 6.3.2.5. Duct Coverings, Linings, Adhesives and Insulation
- 6.3.2.9.(3) Supply, Return, Intake and Exhaust Air Openings
- 6.3.2.9.(4) Supply, Return, Intake and Exhaust Air Openings
- 6.3.3.1.(1) Requirement for Venting
- 6.7. Piping Systems, only:
- 6.7.1.2. Clearances
- 6.7.1.3. Surface Temperatures
- 6.9. Fire Safety Systems, only:
- 6.9.1.2. Hazardous Gases, Dusts or Liquids
- 6.9.3. Carbon Monoxide Alarms
- 6.9.4.2. Fireplaces
- Part 7 – Plumbing, only:
- 7.1. General, only:
- 7.1.1B. Plumbing Facilities
- 7.1.3. Location of Fixtures
- 7.2. Materials and Equipment, only:
- 7.2.10.7. Water Temperature Control
- 7.2.10.7A. Temperature Control Devices
- 7.2.10.7B. Showers
- 7.1. General, only:
- Part 9 – Housing and Small Buildings, only:
- 9.5. Design of Areas and Spaces and Doorways:
- except 9.5.2. Barrier-Free Design
- except 9.5.4. Hallways
- except 9.5.5.1. Doorway Opening Sizes
- except 9.5.5.2. Doors to Public Water-Closet Rooms
- 9.6. Glass, only:
- 9.6.1.4. Types of Glass and Protection of Glass
- 9.7. Windows, Doors and Skylights, only:
- 9.7.2.3. Minimum Window Areas
- 9.7.5.2. Resistance to Forced Entry for Doors
- 9.7.5.3. Resistance to Forced Entry for Windows
- 9.8. Stairs, Ramps, Handrails and Guards
- 9.27. Cladding, only:
- 9.27.6. Lumber Siding
- 9.27.7. Wood Shingles and Shakes
- 9.27.8. Plywood
- 9.27.9. Hardboard
- 9.27.10. OSB and Waferboard
- 9.27.12. Vinyl Siding, Insulated Vinyl Siding and Vinyl Soffits
- 9.29. Interior Wall and Ceiling Finishes, only:
- 9.29.4. Plastering
- 9.29.5. Gypsum Board Finish (Taped Joints)
- 9.29.6. Plywood Finish
- 9.29.7. Hardboard Finish
- 9.29.8. Insulating Fibreboard Finish
- 9.29.9. Particleboard, OSB or Waferboard Finish
- 9.33. Heating and Air-Conditioning, only:
- 9.33.6.2. Materials in Air Duct Systems
- 9.33.6.4. Coverings, Linings and Insulation
- 9.33.8.3. Clearances
- 9.34. Electrical Facilities, only:
- 9.34.2. Lighting Outlets
- 9.5. Design of Areas and Spaces and Doorways:
- Part 11 – Renovation, only:
- 11.5. Compliance Alternatives, including Compliance Alternatives listed in Tables
- Tables 11.5.1.1.-A, 11.5.1.1.-B, 11.5.1.1.-C, 11.5.1.1.-D/E, and 11.5.1.1.-F. which cross-reference requirements in the remainder of the “Complex Building” syllabus.
- Part 12 – Resource Conservation and Environmental Integrity, only:
- 12.1. General
- 12.2. Energy Efficiency, Carbon Dioxide Equivalents and Peak Electric Demand:
- except 12.2.1.2.(3) Energy Efficiency Design
- 12.4. Water Efficiency
Division C – Administrative Provisions, as follows:
- Part 1 – General, only:
- 1.1. Application
- 1.2. Design and General Review, only:
- 1.2.1. Design
- 1.3. Permits and Inspections, only:
- 1.3.1.1. Requirement for Permits
- 1.3.1.4. Permits Under Section 10 of the Act
- 1.3.1.5. Conditional Permits
- 1.3.2.1. Permit Posting
- 1.3.2.2. Documentation on Site
- 1.3.3.1. Occupancy Permit – General
- 1.3.3.2. Conditions for Residential Occupancy
- 1.3.3.3. Notification
- 1.3.3.4. Occupancy Permit – Certain Buildings of Residential Occupancy
- 1.3.5.1. Prescribed Notices
- 1.3.6.1. Application
- Part 2 – Alternative Solutions, Disputes, Rulings and Interpretations, only:
- 2.1. Alternative Solutions
- 2.4. Rulings and Interpretations
Supplementary Standards
The following Supplementary Standards may be covered in the exam:
- Supplementary Standard SA-1 – Objectives and Functional Statements Attributed to the Acceptable Solutions
- Supplementary Standard SB-1 – Climatic and Seismic Data
- Supplementary Standard SB-2 – Fire Performance Ratings
- Supplementary Standard SB-4 – Measures for Fire Safety in High Buildings
- Supplementary Standard SB-8 – Design, Construction and Installation of Anchorage System for Fixed Access Ladders
- Supplementary Standard SB-10 – Energy Efficiency Requirements
- Supplementary Standard SB-13 – Glass in Guards
Updated: January 21, 2026
Published: January 12, 2026